Road rehabilitation starts with understanding why pavement fails.
In this episode of The Track, Dennis Howard sits down with WIRTGEN GROUP’s Jessie Boone to explain the differences between Cold In-Place Recycling (CIR) and Full Depth Reclamation (FDR), including when each method makes sense and how contractors and agencies evaluate road conditions before choosing a repair strategy.
Jessie breaks down what happens beneath the surface when roads deteriorate, why some failures require deeper rehabilitation and how CIR and FDR can help extend pavement life while improving efficiency and sustainability.
The conversation also explores how DOTs, counties and contractors assess existing pavement structures, the growing adoption of these rehabilitation methods and the role modern equipment and technology play in today’s road construction projects.
In this episode, you’ll learn:
Whether you work in roadbuilding, pavement preservation or public infrastructure, this episode offers practical insight into choosing the right rehabilitation approach for long-term road performance.
To learn more about CIR, FDR or the equipment that supports these applications, contact your local RDO Equipment Co.